Advertisement
Advertisement
Song Metrics
- Key
- A
- Duration
- 3:06
- Tempo (BPM)
- 113
Critical Path is a neutral song by Francis Voignier
with a tempo of 113 BPM.
It can also be used half-time at 57 BPM or double-time at 226 BPM.
The track runs 3 minutes and 6 seconds
long with a A key and a major mode. It has high energy and is somewhat danceable
with a time signature of 4 beats per bar
.