Advertisement
Advertisement
Song Metrics
- Key
- C
- Duration
- 2:32
- Tempo (BPM)
- 64
Behind Schedule is a neutral song by Le Lounge Bar Français
with a tempo of 64 BPM.
It can also be used double-time at 128 BPM.
The track runs 2 minutes and 32 seconds
long with a C key and a minor mode. It has low energy and is very danceable
with a time signature of 4 beats per bar
.