Advertisement
Advertisement
Song Metrics
- Key
- F♯/G♭
- Duration
- 0:30
- Tempo (BPM)
- 101
Infraction / Redact / Wobbler / Unliquidated Damages is a upbeat song by Richard Nohel
with a tempo of 101 BPM.
It can also be used half-time at 51 BPM or double-time at 202 BPM.
The track runs 30 seconds
long with a F♯/G♭ key and a major mode. It has low energy and is very danceable
with a time signature of 4 beats per bar
.