Advertisement
Advertisement
Song Metrics
- Key
- B
- Duration
- 1:37
- Tempo (BPM)
- 134
Critical Path is a melancholic song by That Streets
with a tempo of 134 BPM.
It can also be used half-time at 67 BPM or double-time at 268 BPM.
The track runs 1 minute and 37 seconds
long with a B key and a major mode. It has average energy and is very danceable
with a time signature of 4 beats per bar
.